So, this week the contractors were super busy. Possibly trying to make up for not getting much done last week? Don't know.
In the Basement:
The sheetrock finally went up! Actually, it went up, then it came back down so they could put up insulation to help block noise, then it went back up. It's all getting mudded now, and probably has another coat to go. At the same time, they installed the new windows and started to add trim.
sheetrock!
old window on the left, new window on the right
bedroom with sheetrock and a new window
future kitchen starting to look more like a kitchen
On the first floor
They added in sheetrock to the old door to the pantry, slowly making the kitchen feel a little more normal.
old pantry gets closed off
On the second floor
They put in the new window for the new office, which makes our bedroom much brighter. They also got started on the new washer/dryer. They pulled the plumbing up and opened up a new doorway so that it will be accessible from the hall.
new massive office window
new washer dryer closet, view from the hallway
current view of the back of the house- all windows in!
No comments:
Post a Comment