Sunday, February 26, 2017

Air Conditioning!

So - our 100+ year old house never had central air conditioning, despite the miserably hot and humid DC summers. We got by with two small window units upstairs that were loud and never worked well, and one big floor unit downstairs that was really loud and never worked well. We always knew that we needed to get central air installed, both to make our lives more pleasant every summer and for eventual resale value. Since it's a pretty specialized thing, we thought it made more sense to work directly with a company, instead of paying a contractor to sub it out. And since we've heard that it's cheaper to install in winter in their non-peak time, we wanted to get it started this winter.

Sometime last fall I reached out to a company that specializes in doing high-velocity air conditioning systems, which are meant to be installed in older homes that don't have big air ducts. We thought the quote was a bit high and wanted to get a few other quotes to compare from other companies - but could not get any other hvac company to respond. All of a sudden - the original guy texts me to say he's had a last minute cancellation and can offer us a deal if we can start immediately. So after a little bit of negotiation over text (a first for me), we finally had a deal and scrambled to get ready.

This is just horrible timing for us to have a major renovation occurring. Firstly, we're starting daycare, so we are in the midst of a huge change to the morning and evening schedules, and full of lots of stress and second-guessing. Second, we were about to head out of town for the long weekend, so had to scramble to figure out what to do with the cats and giving them access, etc. Third - well, I can't think of a third right now - but it feels like there are a million things going on and reasons that this was not great timing for us. But regardless - we signed the contract, and they unloaded our new air conditioning system while it was literally snowing outside.

all this stuff arrives the morning they get started

it's just hard to believe all this stuff is going to fit

In the first two days - a team of two men installed the holes and tubing throughout the house. They ran tubes through closets to get from the attic down to the main floor, keeping the duct-work almost completely hidden. On the second floor, they ran the tubes through the attic and into the ceiling, so there isn't any exposed ductwork. They managed to get one vent into every room (and as many as three in the big rooms) except for the new half bath. Because it is an addition, they would've needed to get through the old exterior brick wall and under an old door header - and it would've required exposed vents in really obvious places, so we just decided to skip it.

one of the guys drilling a hole

Then we went to the beach and enjoyed the really warm weather while they kept working.

lesson learned: get out of town if you can

They spent another two or three days getting the unit up on the roof, connecting the power, and getting all the tubes hooked up to the circulator thing. After less than a week, they were gone and you can barely tell that they were there at all.

one of the vents in the kid's room

one of the vents in the dining room

two more in the kitchen above the cabinets

one in the living room - so subtle you almost can't see it

the return is at the top of the stairs - should help circulate air easily through the whole house

We turned on the fan, and it definitely makes a whooshing, whistling noise because it is high-velocity air, but it's so much quieter than the old window units were and frankly might be nice to drown out some street noise. There was only one spot where they couldn't use closets to get to the first floor, so they grouped a bunch of tubes together and we'll have to come back and box it in.

the one spot we need to come back and box in in our bedroom

Even though it is still February, it's now crazy warm here and already clear that having AC will be a very huge improvement for us.

In other news - Spouso told the kid that the new holes in the ceiling were ridiculous, so he now thinks that they are named "ridiculous". He likes to go around the house pointing them all out and shouting "ridiculous!".

Anyway - a huge improvement and major to-do item scratched off our house list. We're talking to architects and trying to figure out next steps for other major projects, while I continue to slowly work on finishing the sleeping porch. Hopefully more progress to report soon.

Wednesday, January 18, 2017

Progress on the Sleeping Porch

So - most of our projects have been rather short-term and distinct - we like to push through and get things done as quickly as possible to avoid projects just dragging on forever. This project is the exact opposite - we have been working on the sleeping porch in fits and starts for several years now. I think it's time to finally post this one, in hopes that this will encourage me to actually finish it all the way.

2012 - Starting Point
So, when we first moved into our house (>4 years ago), there was a wide but shallow room along the back of the upstairs that had really nasty crankable window panes, that was completely unusable in cold weather and obviously in need of renovation. Because the windows were made of many small panes of glass, it was completely open to the weather and thus freezing in the winter and filthy - so we didn't use it at all.

original sleeping porch with floor-to-ceiling crankable windows

2014 - Contractors Fix the Windows
In 2014, as part of our big renovation which fixed up the basement and did some stuff on the first floor, our contractors removed the nasty windows and replaced them with walls and a few real windows. It was closed off but not insulated, so still freezing in the winter and not really usable. At this point, we figured out that our long-term plan for the space is to make half of it a master bathroom, and then other half an office (with a wall in between), even though we couldn't actually make all that happen yet. So - the windows were placed based on the long-term plan and nothing else happened for a while.

after the contractors close in the walls and install real windows

2015 - Good Intentions but No Real Progress
Then, in early 2015, I boldly laid out my design plan and goal to have the room finished in a couple weeks. This was part of the push to finish up big projects before the baby arrived - which didn't happen for obvious reasons. I got only as far as removing the nasty paneling from the ceiling, which made it slightly more attractive but just a bit colder in the winter - so still not usable space.

view to the right

view to the left. basically just a spot for a litter box to go. 

2016 - Impending Deadlines Make Things Happen
So - last year we decided to refinance our mortgage, based on the value of our house increasing. We were told that an inspector would need to come see the house and that nothing could still be under construction, so we got to work finishing all the open, constructiony spaces. We decided to go ahead and finish the halfbath and mudroom, but were torn about the kitchen and sleeping porch - knowing that we weren't ready to really renovate those spaces. So instead, the plan was just to patch the holes in the kitchen and stick up sheetrock in the sleeping porch - minimizing our costs for things that would just get torn out later. We hired a contractor for some of the plumbing and electrical work in the half bath, which included venting the toilet all the way to the roof through the sleeping porch. So they didn't do anything else to the sleeping porch except to install a huge pipe right through the middle of the room. Then, we spent all summer and most of the fall on the halfbath/mudroom project, leaving only a couple days before the inspector was scheduled to arrive. So we finally just took a couple days off work to get it done. We stapled up insulation, rented a van to get sheetrock and a lift to put it up, and then I mudded and primed almost everything (until I ran out of paint). I also used leftover cement paint to fix up the floor. When the inspector came through, it looked like a livable space, but certainly not a nice room. And once that deadline had passed, no more work happened.

 the pipe in the middle of the room

sheetrock going up

more sheetrock going up

the last piece of sheetrock goes up around 2am. there is joy and mirth all around. 

mudding the walls. making a mess. 

after priming and moving some plants back in
(shout-out to our Vienna contingent - Rubberto is still alive!)

view to the right - looking sort of like an office

2017 -  Finish it Up
So, my goal is to finish all of the remaining renovations to the house this year. That means that in a couple months, we will hopefully make the whole master bathroom thing happen. In the meantime, I can finish up the office space myself - which will make the house better organized in the process. My goal is to paint the walls, trim the windows and add some curtains, add some bookcases, get a new desk and chair, and basically do everything that can be done now that won't have to be ripped out for the bathroom project (ie, no floor yet). Meanwhile - we are moving forward on the bathroom and kitchen projects, so more on that hopefully soon.

Thursday, November 3, 2016

Fixing Up the Kitchen

Once we finished off the halfbath/mudroom project, we shifted focus to the kitchen. We are clearly not fully renovating the kitchen, though we really really want to - instead, this is just a sort of patch job to fix up all the holes and glaringly unfinished spots. 

1. Patch the Holes in the Floor
Way back in the day, when there was a wall between the kitchen and dining room, there was a small radiator just inside the kitchen. When the wall came down, the radiator was removed, which left holes in the floor. I covered them with packing tape, which was working pretty well at keeping out the cat food and cheerios that are otherwise dropped down, but we needed a more permanent fix. So, we picked up a couple of wood floor samples, found one that matched the color pretty well, and then just cut it down and glued it into the spaces.  

old floor with holes for the previous radiator...

now patched and nearly invisible! 

2. Paint the trim
Parts of the kitchen have been painted slowly over the last couple years, but there was still some neon yellow trim and a door frame that had been peeling and picked at for a while. So, I grabbed a can of our trim paint and covered everything up.

the last of the yellow trim disappears

3. Patch the Sheetrock
There were several holes left behind from our first contractor when they took down the wall to the dining room and installed pipes for the washer/dryer above. Our second contractor framed those for us - so all we needed to do was install the sheetrock. We picked up the materials, cut them down and screwed them up, quickly mudded a couple times, and then primed and painted them.

second contractor framed in the pipe

and the beam between the kitchen and dining room

so we put up the sheetrock...

and then mudded and painted everything

pipe gone!

4. Backsplash
We used to have one of those stoves with the dials in the back, and a microwave above it - so the painted, textured wallpaper only covered part of the wall behind the stove. When the stove was replaced with a slide-in option and the microwave hood removed - it left a really ugly wall that was partly covered with peeling wallpaper. Thankfully, we could just pick up some peel & stick tile mosaic that was easily cut with scissors to fill the space, and stuck it up quickly.

new tile going over the nasty space above the stove

new backsplash up and definitely making things nicer. 

5. Pantry 
One of our longstanding storage issues has been the lack of a pantry, ever since we originally removed the walk-in pantry to make it into the new half bath. Since then, we've been relying on a set of metal shelves which are really not ideal. Not only are they ugly - but they are completely open and exposed, which means that our kid can easily walk up and pull anything and everything off (which he does all the time). Plus, I have this fear that he'll try to climb them and pull the massive thing over on himself - though he probably doesn't weigh enough to actually do that.  The shelves were originally in the dining room, and then we moved them out to the mudroom where we thought it would be safer - and then once we started working on the mudroom, the shelves got moved back into the dining room again.  After cleaning up an entire box of pasta that was thrown around the dining room one too many times  - we finally decided to come up with a new, more permanent solution by adding more cabinets onto the back side of the kitchen island. Because they are top cabinets, they are only half the depth of a base cabinet, making it easier to see everything inside and not taking up to much more floor space. We grabbed 2 3' wide top cabinets, and then built a quick frame to get them up off the ground and level with the base cabinets. Then we just added a long 1"x12" shelf board to serve as the countertop. This is obviously not ideal or a permanent renovation - but it takes care of the storage issue and lets us try out this floorplan for the eventual full kitchen renovation.

new pantry cabinets added to the kitchen island

old pantry gone - this part of the dining room looking normal again. 

So - this kitchen is definitely still ugly - with two different colors of cabinets and now three different types of countertops. But - it no longer looks unfinished and hazardous - and that's a huge improvement for us. All this time in the kitchen has made both of us eager to actually gut it and fix it all the way up - but for now, this is good enough. Now - shifting gears once more to the sleeping porch - our only remaining unfinished space.

Monday, October 17, 2016

Travelling with a Toddler: 3 Days in Chicago

We actually have a huge amount of progress on the house to talk about - but first let me fill you in on our recent trip to Chicago.


Background
So, last year for Christmas we decided to give the gift of a short vacation to my mother in law for a couple reasons. 1) I had some frequent flyer miles that were about to expire, but wouldn't get us very far. 2) We hadn't yet taken our son on a plane and felt like we should, but were pretty nervous about it and thought an extra pair of hands would be helpful. 3)  She is one of those ridiculously hard to shop for people, so we thought the gift of time together would be something she would appreciate. 4) We wanted to try out the idea of traveling with family so that we got to both see family and new places, and thought this would be a good first try.

Once we settled on the idea of travelling to a city for a short vacation, we pretty quickly settled on the idea of Chicago because it was on a short list of cities we could get to on a nonstop flight under 2 hours that looked like it had a bunch of interesting things to do. We originally planned to go in May, which would've been a nice time to be there - but had a couple conflicts so we rescheduled for October hoping it would be better time and the weather would still be ok. Then, after stressing about this for over 10 months - the trip finally occurred.

Airports & Baggage
The thing I was most stressed out about was the actual travelling part - having everything we needed, but not too much so that we could get through security and on the plane. We decided to check a couple bags so that we wouldn't have to worry about getting them through the airport and finding overhead space - which was good - but it didn't solve the problem of getting the bags to and from the airport itself. So with a travel crib, 2 big checked bags, plus the stroller and a couple carry on bags -  we had way too much stuff. Getting out of the airport, onto the subway, and into the hotel was a seriously unpleasant endeavor.  Getting through the airport wasn't actually bad since most things were checked and we only had one larger bag that needed overhead space. We opted not to bring a car seat, which was super helpful, but meant that we couldn't use any cars on the trip and were reliant on the subway or our feet to get around.  Lesson learned - get everyone into one checked bag and have adults pack as lightly as possible.

Airplanes
Once we were actually on the plane - things went surprisingly well. The kid was super fascinated by everything and not at all interested in napping, despite the fact that the plane was planned for exactly his nap time - so he spent the flight staring out the window, looking at books, eating small snacks when landing and taking off, and putting stickers all over his dad. On the flight back, he fell asleep at the gate and stayed asleep for most of the flight without noticing. For this part - I'm glad we brought a lot of stuff - from snacks to books, blankets, the whole shebang was in his diaper bag. We also got lucky and had an empty seat between us on the way there, but not on the way back - obviously, having an empty seat is helpful but turned out not to be critical, since he wanted to sit in my lap and watch the window most of the time anyway, or stood on the floor between our legs.

tip: bring stickers. buy a beer. 

The Hotel
One of my worries was where to stay - since the kid wakes up early and goes to sleep early, which is not super convenient on a vacation. Since my MIL was travelling with us, we debated getting 2 hotel rooms, but decided to book an entire apartment through AirBnB for about the same price. It was our first experience with AirBnb, but it worked out great. Having an entire apartment with two bedrooms meant that there was a living room for him to play in the morning without waking everyone up, and at the end of the day - a place for us to hang out and watch tv without keeping up him. The kitchen was perfect for making him breakfast or having dessert and wine at night.  I think having our own apartment/house was a huge success and definitely a strong recommendation for anyone traveling with small kids. There was even an indoor swimming pool that was great when the weather was crappy, and we were stuck inside.

his favorite corner of the apartment - floor to ceiling windows all around.

Sightseeing
So the reason we wanted to go to a city was to test out our ability to sightsee with a kid; we know we could take a vacation to the beach and it would work out - the question was how to make city travelling work. So we lined up a couple touristy things to do with a rough plan to do something every day in the morning before his nap. We tried to strike a balance between things we would enjoy and things he would enjoy - and spent as much time as possible outside. One day, we walked around Millennium Park and saw the huge Buckingham Fountain (he's a huge fan of fountains and people watching). The next day, we walked along the river and out to Navy Pier. The last day we took a boat cruise of the lake and Chicago River, which he was also super excited about. In general, all of those outdoor, sightseeing activities worked out great - as long as he got a few opportunities to run around and stretch out his legs. We watched the weather forecasts closely, and when the weather turned rainy and cold, we spent some time in our indoor swimming pool. Definitely critical to have a couple options for each day that we could pick between based on the weather and everyone's interests.

trying hard to get into the Buckingham Fountain

very excited to touch the big reflective bean at Millennium Park

excited but getting tired on the boat tour of Lake Michigan

Museums
We only tried one museum while we were there - the Field Museum, which is a natural history museum. I wanted to go to the Art Institute, but was afraid that he would be too loud. He would have liked to go to the Children's museum or aquarium, but we weren't super excited about those options - so this was our compromise. I think it was a bit of a mistake - it ended up being a place that none of us really were excited about. We would try to read the exhibits, but get pulled away by him too quickly. He would see an occasional button and get really excited to press it - only to have a crusty old archaeologist start explaining history to him. Maybe in the future we would either skip museums altogether, or split up and let an adult go to the museum of their preference while the other adult watches the kid or something.

Restaurants
We ate out a lot. For lunch we generally picked up something on the way back from our excursion to eat in the apartment, but for dinner we went to a different restaurant every night. We used yelp to find good ones that were on the casual to loud side and went at about 6 pm each night. My MIL said that we should have high expectations, but be flexible and prepared - and that was exactly what worked. As soon as we sat down, we ordered food for him and brought additional snacks to keep him occupied. Once he was done eating, he would sit in one of our laps to play with a toy or book or watch a video on our phone. If he got loud, one of us would take him outside for a quick walk around the block. Having back up plans allowed us to eat mostly relaxing (although quicker than normal) meals, in a couple really nice restaurants.  It made me think that we've been too cautious about taking him out and should try more.

one of many lovely sunrises I got to see

Conclusions
So - this was definitely not a relaxing vacation, but I'm glad we did it. I feel like we learned a lot about travelling with him, and are ready now to go for a slightly longer trip somewhere. I can see how travelling, like going to restaurants, is something a lot of families with small kids would just avoid - but it feels like an important thing to do, so I'm glad we gave it a try.

Monday, October 10, 2016

Finishing Up the Halfbath and Mudroom

Once the trim was finally done, we got to add a couple small things to make the rooms feel pretty close to finished.

1. Towel Ring and TP holder
When we ordered the sink faucet, I just grabbed the TP holder and towel ring to match. They finally went up with a nice new turkish fouta towel.

new towel ring with fancy towel

with matching thing

2. Shelves
I've noticed recently that I seem to put up shelves often- kinda my go-to thing for making a space more organized. So, not surprisingly when I realized that there was no place to store extra TP rolls, I ended up getting a new board, staining it, and hanging it with some drywall anchors. I pilfered some random stuff from around the house to make it look a little more blogy.

new shelves

3. Secret Door
One more important issue that needed to be addressed was the access panel to the pipes. It needed to be accessible, but otherwise basically invisible most of the time. So we cut an extra wall panel, used some magnets and a little little claspy thing to hold it in place.

now you see them...

now you don't! 

4. Bench
In the mudroom, since it is a mud-room, I wanted a place to stop and take off shoes and store a pair or two - so I pulled together some scrap wood and built a little bench. Then I used some leftover cushion and padding to upholster it.

new little bench

I know. you're shocked that I posted a picture of my little cat.

5. Wall Art
In the name of functionality and organization, I ordered a fun new guy to hold keys by the back door. Then I grabbed an old poster that was framed and a good size and just hanging out. It's not the long term artwork, but it works for now and makes the room look a little more personal. 

our new cast iron octopus

poster gets hung

So - these rooms are like 97% done now. There are a couple little things we need to finish up here and there - but for now, we're shifting gears to finish up the kitchen and sleeping porch.

a functional and glamorous mudroom

half bath is so much better than the toilet sitting on  plywood that it used to be.