Wednesday, December 20, 2017

Renovation Update: Finishing Up

So - the last two weeks have been all about finishing up, cleaning up, and getting the house back together. 

Kitchen
They finished installing the cabinets, and then we had to wait for the countertops to arrive. While we waited, the electrician came back to finish all the lighting and outlets - which look amazing. Everything's on a dimmer, so we have lots of options to make it really bright for cooking, or dimmer and cozy. We almost immediately started putting things in the cabinets - glass cabinets are trickier than I expected. I also got to work staining the floor, making it the same color as the upstairs which we refinished a couple years ago, and then giving it 2 coats of poly to protect it. (I want to do another coat, but haven't gotten the chance). Lastly- the countertops finally arrived, so they were installed, and then the sink was hooked up. I got to work painting the walls, which makes everything look clean again. The cabinet above the fridge doesn't fit though, so we had to reorder a new one and wait to get switched out - otherwise, we're basically done. 

lights are on!

floor gets a quick sanding

then stain

then poly - almost done

 stuff going in the cabinets

counters arrive! 

Upstairs
They finished the tile in the shower, and installed the toilet and towel racks. Unfortunately, they broke the shower doors while trying to install, so then we had to wait for new ones to arrive. While we waited, they installed the heater in the office and trimmed that window, which were two small things we wanted to do to that room, but we'll plan to actually finish it ourselves. After some debate, they also patched the floor where the old closet walls had been in the bedroom - making it almost seamless.
 
new linen closet all trimmed out (on the right)

floor getting patched where the old closet walls were
 
office baseboard heater and window trim

tile done - shower doors getting finished up

toilet and a cat (they like the heated floors)

vanity all functional

clothes going back in the massive closet

Clean up and Put things Back
The biggest development though, was that they finally took down all the remaining curtains and floor covers, which let me finally vacuum and dust everything. With an almost fully functional kitchen, we took apart the temporary kitchen in the dining room and half bath, and got those spaces back in order. The house still has a few boxes and paint cans around, but it's feeling almost back to normal.

able to cook again! 

The guys are finishing up the punch list right now - so hopefully they will be all done and out of our house. I will post the final revel asap.

Wednesday, December 13, 2017

Main Bath - Radiator and Lights

After the epic battle stripping the door, we didn't have capacity for any major other projects for this room. Instead, I just had a few little tweaks to make the room a little more functional and attractive.

The Radiator
First, the radiator was driving me crazy. There has always been this cage box thing covering it up, which is so large that it blocks my towel rack. So my towel is either bunched up so it never dries, or hanging over the stairs or somewhere else inappropriate. Plus the cage thing is ugly. So we took it off, I cleaned up the radiator, dusting off a hundred years of dust bunnies, and then gave it a light coat of radiator spray paint. The radiator is quite ornate, and much smaller than the cage was, so now my towel can actually fit on the rack - and should be nicely toasty!

radiator cage - cutting off my towel rack

cage removed, radiator cleaned up but dingy

getting sprayed

all done- my towel fits now!

Little Shelf
As soon as the radiator cage came off, it was clear we had created a new problem. Despite its ugliness and towel-blocking issues, it had been a helpful place to store things. So helpful, in fact, that it was always covered in stuff. So - I needed a replacement that was small enough not to block the towel rack, but just large enough to store one or two things. For simplicity sake, I just cut a spare board down to the length of the radiator, stained it, and placed it on top. I could've made something more complex, but hey.

little shelf for holding just a bit of stuff

Lights
Not a functional issue really, but we always hated the sconces in this room, which are super deco and also hum loudly. So - I just ordered 2 new ones in a basic style and finish that matches the rest of the house. Once we had a sunny weekend day without guys in the house, we finally switched them out. 

old lights - huge and hideous
 
new lights! 

New Art
Just a small thing, but I ordered a print from etsy and stuck it in one of our existing frames. Something to add a little color and make this look more like a kids' bathroom. (got it here). 
new wall art - both bathy and kidish

new art up over the new shelf

remember this? so much better now!

And now I'm calling it done. I had bigger ideas for this room - tearing out the closet, or replacing the sink - but for now - this is good enough. We need to switch over to another project. More on that soon. 

Wednesday, December 6, 2017

Main Bath - Door and Trim

So after I scraped and painted the walls and ceiling in the main bathroom, the trim started looking really bad. We clearly had more hazards to address.  

The Door:
The door had been painted many many times and was pealing and cracking in all the corners. As part of my on-going paint chip removal initiative, I wanted to fix it. So during our weekend naptime, I grabbed my heat gun and started to remove it. I was shocked to find the door underneath was stained and in pretty good shape. I spent an hour or so on three different days, and got it about as far as I could - most of the paint was gone, but it was still sort of gunky. So we took it off its hinges, took it out to the garage, and coated it with stripper. That removed the remaining scuz, but there were still a few spots left. I had one more night with the heat gun to get a couple more of the thick patches, one more round of stripper to clean it off again,  and then just stained it and coated it with poly and put it back up. Altogether - this was probably around 15 hours of unpleasant work, so I will think long and hard about painting a stained door again. (Sidenote: I don't recommend taking your bathroom door off for a week while you have lots of strangers in the house-- makes things really awkward). 

the offending door

closeup of some of the cracking and pealing paint

there's just so much pealing paint

after one day with the heat gun - hello stained door!

after another day or two with the heat gun - still gunky. 

after 1 round of stripper

and another round of heat gun

stripped, sanded, stained, and back in place!

Trim
While the door was off its hinges and waiting outside, I ended up grabbing a brush and giving the other door and trim a quick coat of paint. After spending so much time trying to remove paint, I felt bad adding yet another layer to the closet door - but it wasn't chipping or in bad enough shape to need to be stripped, and now it just looks brighter and cleaner, with no chipping paint!

closet door getting painted

trim gets freshened up

So now there is no more pealing paint in this small room, but there are a couple more little things I want to do to improve the functionality of this space and make it a little nicer looking. 

Monday, December 4, 2017

Renovation Update: Rapidly Losing Patience

So - whichever week we're on now - is it 9? - seems to have been the turning point of my patience. I could handle the cooking outside on the grill in the middle of the night - but now every little thing is driving me crazy. Sadly, it looks like we still have at least one more week to go. End is nearly in sight, but not close enough.

In the kitchen - they finished installing all the cabinets, and started putting on trim. They also hooked up the vent hood.
cabinets in, hood up

more cabinets

Upstairs - the big progress was getting the tile started. They put down the floor in one day, and then most of the shower walls the next. They will be finishing up the walls and then grouting today - so that room is getting close to done now.

shower tile

Another fun development is the door to the new linen closet upstairs. So far, we've been able to reuse old doors everywhere, but we didn't have one for this new closet. The contractor got quotes for a replacement door - $1000 for it to actually look like our others, and $200 to be white. Since none of the other doors in that hall are white - i thought it would look silly, and there was no way we were going to pay $1000 for a door. So, we went to this 2nd hand building supply place, found a perfect match that was exactly the right size, for $15. They begrudingly framed it in.

new linen closet door

 I guess the other big progress this week was me starting to put the house back together. After a couple days at home with a sick kid, I finally lost my patience with all the tarps blocking the doors and hanging down from the walls, so I just took them down. I also started pulling out Christmas decorations, which isn't really on the list of things you're supposed to do during a renovation - but hey.
halfbath gets repainted and put back together

with the door covers gone, cats can now hide under the floor covering. 
 
almost looks like christmas. 

So close. so close.

Monday, November 27, 2017

Renovation Update: Floors and Cabinets

So once the big issue was fixed last week - the team really got moving and got a lot done, despite the short week. 

In the kitchen - the floor went down after spending the weekend acclimating. We ended up going with an unfinished white oak so that it's the same species as the rest of the first floor. I will just finish it later, once there's room. They quickly covered it up to protect it, and then the cabinets arrived. On Wednesday and Friday they were able to get almost all of the base cabinets installed, so that the countertop people can template today. We had a couple issues - and thankfully I had the day off and was there to help - firstly, the floor isn't even (shockingly), so they had to build up bases to level them all off. Secondly - the corner cabinets couldn't be opened without hitting each other, so they ended up having to cut down the massive pantry cabinet so that the door next to it can be opened. The real news is that they hooked the stove back up - so we can cook again. This is a huge improvement - since we had been grilling outside and it has gotten cold and dark. 

new floor goes down

cabinets arrive!

cabinets coming together

more cabinets getting installed

countertop selection made - should be bright and white and sparkly!

The big action was all downstairs, but there was some progress upstairs too. They worked on floor and window trim, and hooked up the new vanity. Since I was home on Wednesday, I painted the bedroom - so one room is starting to look finished. I still have lots more painting to do though. 

bedroom gets floor trim...

...then i paint it- looking almost done

window trim

vanity all hooked up and working

 So - the countertop people are coming today to take measurements. I'm hoping that means all the remaining cabinets go in quickly, and then maybe they start doing tile and finishing touches. We're getting close!